I-85 Express Lanes Extension Project will Require Daytime Lane Closures

Press release from Georgia Department of Transportation

Be prepared for traffic delays if you plan on traveling on I-85 this week as Georgia Department of Transportation reports daytime lane closures will be required for work on the I-85 lane extension project. Georgia DOT report that this is necessary to allow contractors to build barrier walls.

This will be as follows.

  • Left lane closure beginning Wednesday, September 14th through Friday, September 16th between 10 a.m. and 3 p.m. for setting barrier walls.
  • Right lane closure beginning Wednesday, September 14th through Friday, September 16th between 10 a.m. and 3 p.m. for setting barrier walls.

These will be:

  • SR 20 NORTHBOUND: I-85 NB ON RAMP – I-85 SB ON RAMP
  • SR 20 SOUTHBOUND: I-85 SB ON RAMP – I-85 NB ON RAMP

Motorists are advised to “slow down and proceed with caution through the work area as workers and heavy equipment will be in close proximity to the roadway.”

About Sharon Swanepoel 2641 Articles
Sharon Swanepoel is the Publisher and Editor of Your Local News, which includes Loganville Local News, Monroe Local News and Walton Living Magazine.
Contact: Website
%d bloggers like this: